Grouting & Anchoring

Anchoring

Monneli Anchortite EP

FAST SETTING EPOXY ANCHORING GROUT

 

Uses
ANCHORTITE EP is used as a general purpose adhesive for fixing two or more substrates together.
Patching compound
Cat’s eye adhesive for fixing dowels in highways, roads, bridges, tunnels airports, etc.
Vertical and horizontal structural bonding
back to Grouting & Anchoring
Technical Information
Product Description

ANCHORTITE EP is a two part toughened epoxy adhesive that cures rapidly and will permanently bond together most building substrates found within the construction industry.

Advantages
  • Excellent sheer and impact strength
  • Resistant to a wide range of chemicals
  • Excellent adhesion to a wide variety of substrates
  • Fast setting, less down time for traffic
  • Resistant to attack by many chemicals
  • Easy to apply
  • Ecofriendly. 100% solids
Packaging, Coverage / Consumption

Packaging:

ANCHORTITE EP is supplied in 1 Liter kit (2 Components).

Shelf Life & Storage

Storage:

Keep the product in dry, covered conditions between +10ºC to +25ºC. In these conditions, product stability is 12 months from date of manufacturing.

Technical Properties
PROPERTIES RESULTS
Density at 25⁰C  1.48 kg/L 
Mix ratio by volume  1:1 
Pot life at 25⁰C (60 grams)   8-10 minutes 
Shore D hardness Up to 65%
Compressive strength (ASTM D 695) >40 N / mm²
Flexural strength (ASTM C348) 18.3 N / mm²
Bond strength to concrete/Slant shear (ASTM C 881) 8.3 N / mm²
Bond strength to steel (ASTM C321) 2.2 N / mm²
Water absorption 0.035%
All values are subject to 5-10 % tolerance
Application Information
Instructions for use

Concrete Preparation

Surface should be dry, clean, sound and uncontaminated. Laitance and loose particles must be removed by either sandblasting or mechanical grinding.

Steel Preparation

All steel surfaces must be clean, dry, free from rust, oil, grease. Shot blasted to Swedish Standard SA 2 ½ is preferable to achieve a white metal finish prior to application.

Mixing

ANCHORTITE EP consists of two components, Part A (resin) and Part B (hardener).Empty entire contents of Part B into Part A and mix thoroughly but quickly over a period of 2-3 minutes. Mixing can be carried out by hand or by electric drill and small paddle attachment. Ensure you reach the bottom and sides of the tin to thoroughly mix together both components. Smaller amounts can be mixed together in correct proportions to avoid unnecessary wastage. Having mixed the two components together, use all within 10 minutes.

Application

Fixing Cat Eye
Fill 2/3 of the hole with ANCHORTITE EP mixture ensuring no air entrapment. Insert the stud lug in a twisting motion. Extra adhesive must be applied on the surface for fixing the stud onto the surface.

Dowel Setting Application
Application can be made by mechanical, pneumatic dosage equipment, caulking guns or by hand. Force the mixture into the drilled hole then insert the steel bar with a twisting motion to ensure intimate contact and a good bond without air entrapment. Lightly tap the anchor/dowel to
ensure complete embedment. Wipe off any excess material from the surface.

Curing

The gel time of ANCHORTITE EP at +25ºC is approximately 8-10 minutes. Traffic may be opened in 3 hours after mixing and placing (at higher temperature curing would be faster).

Cleaning

All used tools should be cleaned with SOLVENTE 10 before the product cures. Cured materials should be mechanically removed.

Recommendations

n Exposure to temperatures exceeding +68.5 ºC for prolonged period is not recommended

n Do not add other materials to ANCHORTITE EP

n Do not mix more grout than can be applied within the pot life of the material

n At temperature above +40ºC, creep of the cured grout may become significant.

n Anchoring strength depends on: Strength of substrate, resin embedded length, hole preparation, steel bar type and diameter.

REBAR (Embedment Depth 8d, Load Factor 0.9)

     Bar size (mm) Minimum Hole Diameter (mm) Hole Depth (mm) Character Loads Allowable Loads
Tension Load (kN) Shear Load (kN) Tension Load (kN) Shear Load (kN)
  10 12 90 22.8 17.28 143 14.4
  12 16 110 46.40 25.00 29.0  20.7
  16 20 145 80.00 44.24 49.4 36.9
  20 25 180 107.60 69.12 67.2 57.6
  25 32 225 116.56 108.00 72.8 90.0
  32 38 290  140.24 129.94  87.6 147.5

 

Embedment Depths for Reinforcing Steel

Embedment Depth Load Factor
8d 0.9
10d 1.1
12d 1.3
15d 1.5

The tensile load capacity data has been embedment has been based on 9 times bar diameter. Some design codes require higher embedment depth. Load capacity is dependent on fully bonded depth. The load factors shown on the opposite table may be fully used when the bars are to be installed at bond lengths other than 9 times bar diameter (d).

Additional Information
Health & Safety

Wear protective gloves and goggles during application. This product contains chemicals which may be potentially harmful to your health if not used properly. It is strongly recommended to read the material safety data sheets for proper storage and to observe precautions.

If contact with skin or eyes happen, use resin cream to remove it from skin followed by clean water, do not use solvent. In case of contact with eyes, use clean water and seek medical consultation.

Important note

The information in this Technical Data Sheet is based on Colmef Monneli’s experience. Colmef Monneli does not accept any liability arising from the use of its products as it has no direct or continuous control over where or how its products are applied. All Colmef Monneli’s Data Sheets are updates on regular basis. It is the user’s responsibility to obtain the latest version.

additional materials
Fast Download
Technical Properties Sheet
download (*.pdf 0.28Mb)
OTHER PRODUCTS
More Products from this section
Monneli Anchor Fix EP

HIGH PERFORMANCE EPOXY RESIN FOR ANCHORING REBARS AND STRUCTURAL LOADS

Monneli Anchortite

Fast Setting Anchoring Grout

RANDOM PRODUCT
Monneli Epofloor SLP50

Self Leveling Polyurethane Floor Topping

Uses
EPOFLOOR SLP50 can be applied on mineral based substrates such as:
Concrete
Mortar
Epoxy modified cement mortars
Used as a broadcast floor topping for:
Warehouses
Cold storage facilities
Parking decks and ramps
Production and storage facilities
Chemical processing
Used as a self leveling broadcast floor topping for:
Industrial floors subjected to moderately
Heavy loading
Factory workshops
Production and storage areas